‘A man attempted suicide, Metro stopped for 1 hr’
‘Train developed a snag, metro services hit for 90 minutes’
To a Kolkatan, this is more or less regular news in the local section of a daily newspaper. Metro, a pride of Kolkata is one of the most efficient ways of moving in the city which is otherwise jam packed with rickety buses, yellow cabs or cars. Connecting Dumdum, northwest corner of the city to Tollygunge (Centre of Bengal film industry) in the south of Kolkata, Metro has always been a commuter’s paradise.
The second problem faced by Kolkata metro is about the snag in its trains. With most of the racks more than 10 years old, rate of developing snags has been increasing. Even due to snags, the metro services are affected for more than an hour. Many times the train even stopped right in the middle of the tunnel adding to the troubles of the commuters. Not only have the old racks that face the problem, even the newly inducted AC trains developed a snag now and then. In spite of numerous tests runs that were conducted before the induction of the AC racks, they still cause trouble. As Kolkata metro is based on the outdated third rail technology in which it draws its power from the third rail running parallel to the two tracks, preparing or repairing racks according to aforesaid technology is a hard task due to the non-availability of the required skill workers. Necessary steps should be taken to train the workers and replacing the older racks with the newer and efficient ones, and then only the charm of Kolkata will get its glory back.